PROJECTS

 
Lead Abatement Equipment - Used.JPG

Lead Abatament by Abrasive & Dust Collection at FC120 MCB Camp Lejuene.

Equipment in Use Bulk Blast Pot, 20, 000 cfm Dust Collector, Mobile Decontamination Trailer, Air Compressor, 750 cfm Air Dryer, and Telescopic Forklift.

BEQ HVAC.jpg

BEQ HVAC

Elevated Tank Pics.png

Elevated Tank 

Above Storage Tanks Prepared and Painted. MCAS Cherry Point, NC

Exterior BEQ Used.jpg

Exterior BEQ

Mold Remediation and Mechanical Upgrades in all rooms, Barracks 292 & 294 at Pope AFB, NC. Managed project from Preconstruction through Project Closeout. (Management Staff)

Giza Parking Lot Used.JPG

GISA Parking Lot Construction.

Design/ Build. Fort Bragg, NC. (Management Staff)

11-29-11 Pope 294 Mold Remediation - Used.jpg

Mold Remediation

Mold Remediation at Pope Army Airfield Barracks 294 (Management Staff)

05-25-10 Archive Outside 03 - Used.JPG

Design-Build USASOC Historian Archive

Building Addition, Fort Bragg, NC. Managed project form Schematic Design through Project Close-out. (Management Staff)

Shell Island Parking Deck - Front.jpg

Shell Island Parking Deck Preservation.

Riza Construction Inc. Repaired Concrete Spalls and Applied a Penetration Corrosion Control Inhibitors to Failing Areas.

08-05-10 Archive Inspection - Used.JPG

Archive Storage Building Testing and Balancing

Inspection by ACOE Special Operations Office Fort Bragg, NC (Management Staff)

 

Inside BEQ 292-294.jpg

Inside BEQ